PSAS consolidated accrual expense · 2025 · CAD · Not separately specified in source schedule
Original approved$85,886,475
Revised authorizationNot established
Reported actual$102,074,440Through 2025-12-31
Published forecastNot established
Actual revenue $115,959,887Net levy / subsidy Not established
Does the breakdown add up?
Source total $102,074,440Covered on the stated basis $102,074,440Reconciled difference $0
Audited expense groups reconcile. Capital contributions of $11.076211 m are included in total revenue $115.959887 m. Annualsurplus $13.885447 m is not uncommitted cash.
CAD · Largest 7 extracted rows by absolute magnitude on this basis. Signed inflows or recoveries retain their minus sign. The full accessible table and sources are below.
These records support the linked project or financial entries. A record link does not establish that every amount or outcome appears in every source. Dated observations and earlier qualifications remain separate.
The City’s November 6 notice schedules the Southside Aquatic Centre front-entrance closure for November 9 and directs patrons to the north side entrance until work is complete. No reopening date is supplied. This entrance notice does not establish a pool-wide closure or current conditions before November 9.
Woodstock · Southside Aquatic Centre
Front-entrance closure scheduled November 9; north side entrance
2026 allocation
Not established
Next target
2026-11-09 · Scheduled front-entrance closure
Latest update
2026-11-06 · Newer entrance notice schedules November 9